ÜRÜN HABERİ
A first in the world from AKSA Generator!

Aksa Generator, which is among the top 5 generator manufacturers in the world and the leader of the generator market in Turkey, continues to provide added value to the energy sector with its R&D studies.
Aksa developed CBE (Close Before Excitation) technology with R&D studies and enabled the generator to be activated in 8 seconds in case of power cuts. Aksa's new technology also provides uninterrupted energy to Istanbul Airport.

Turkey's leading generator brand Aksa Generator continues to accelerate the energy sector by constantly renewing its products and services for uninterrupted energy. With the CBE (Close Before Excitation) technology developed by the company, the company reduced the time to activate the generator from 15 seconds to 8 seconds in case of power outages. Aksa Generator's CBE product is of vital importance especially for departments such as operating rooms, intensive care units and radiology, which can tolerate a maximum of 10 seconds of interruption in hospitals. In addition to hospitals, CBE technology is intended to be rolled out in areas where tolerating power outages poses serious risks, such as airports, the iron and steel sector, data centers and shopping malls. Aksa Generator continues to provide uninterrupted energy by using CBE technology at Istanbul Airport.
Aksa Generator CEO Alper Peker said: "As Aksa Generator, we continue our activities with the goal of 100 percent customer satisfaction; therefore, we are in constant contact with our users to receive notifications about our products. For this reason, we receive the demands of our customers within the scope of our after-sales services and make plans on how we can develop solutions in line with the demands from them. In order to shorten the commissioning time of the generator, we have carried out a series of studies based on our many years of experience in the sector. Within the scope of our R&D activities, we managed to reduce the commissioning time of the generator from 15 seconds to 8 seconds for the first time in the world. We have come to a situation where we will realize projects that will integrate this technology we have developed into a single product as well as the synchronous load supply of multiple generator groups. For example, the time it takes for 10 synchronous generators to feed the load by becoming normally parallel is approximately 30-40 seconds. However, with CBE technology, we are able to offer our customers solutions that will reduce this time to 8-10 seconds."



Yorum yapmak için giriş yapın.
Henüz yorum yok. İlk yorumu siz yapın!